Organisation | Costings | Projects | Costing tab
Summary |
The fields on this tab page are optional. They are used primarily for reporting the costs of Projects to an organisation. Complete them to link a Project with costing details. Cost Centre:Select a Cost Centre here to include a Project in Cost Centre reporting. If the Cost Centre selected here has a General ledger code attached to it, costs relating to this Project will export to the General Ledger system. Job:Projects can be broken down into various Jobs. Use this field to report on the proportion of time spent on each Job in a Project. Award:A Project may be only relevant to one Award. Rate:To override the default rate. Rate amount:A value that will override the default rate set for Tasks within a Task Type. Factor:The Factor is a multiplier that when is combined with the Rate. A standard Factor where the Rate remains the same is 1.0000. |